SKU:85072326721

Edwards - 55 Ton Ironworker 3 Phase, 230 Volt, PowerLink,10" Brake

Free Shipping on orders over $50

Regular price $9547.50 USD
Regular price $9567.50 USD Sale price $9547.50 USD
Sale Sold out
Shipping calculated at checkout.

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Sep 17 - Sep 22

Description

Edwards - 55 Ton Ironworker 3 Phase, 230 Volt, PowerLink,10" BrakeThis 55 Ton Ironworker includes a factory installed coper notcher, provides power for large projects, and offers the ability to customize one of its four workstations with 11 interchangeable attachments, and 17 additional accessories to help improve operator accuracy and productivity. The Angle Shear blades have 2 corner radii and are made of precision tool steel with 2 cutting edges, while the Flat Bar Shear blades are made of precision machined,

Table size: 12" x 12"

) Oil Vapor Content: 0

Edwards TD180/1X3 Features

Easily assembles and knocks down with just 4 bolts

Our 10AP Series offers the convenience of wide or narrow installation wrapped up into one configurable package

1 Year Limited Factory Warranty Overall

HFRL-512 DeVilbiss CleanAir Coalescer Air Filter Water Separator – 1 Regulator 3/4″

Theoretical working capacity  23680 ft²/hr

7 mm) Nozzle

Material Size Pipe Maximum Bend 1-1/2" Centerline Radius 180 degrees Hydraulic Accessory Tool 5-1/2" Machine Size 10 Ton Bender

24" and 36" radius dies

59” working width

Easy Shipping

Quick Dispatch:

Your Edwards - 55 Ton Ironworker 3 Phase, 230 Volt, PowerLink,10" Brake orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Edwards - 55 Ton Ironworker 3 Phase, 230 Volt, PowerLink,10" Brake ships.

Need Help?
Questions about Edwards - 55 Ton Ironworker 3 Phase, 230 Volt, PowerLink,10" Brake, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Edwards - 55 Ton Ironworker 3 Phase, 230 Volt, PowerLink,10" Brake in your area.

Get Shipping Estimates

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy